It’s slab time!  We were lucky enough to drive past the block on our way into town and caught the guys pouring and slaving over the slab so I was able to grab a few pictures.  This was a week before Christmas.  The builder had origingaly told us that he would have the frame up by Christmas time.  That hasn’t happened (today is the 13th January).  We noticed yesterday the timber for the frame had been delivered (we only live around the corner) but it has been pissing down with rain so there will be no frame going up until the rains stops.

Here are the pics of the slab being poured.

05d Torquay House Build - Slab being poured

05b Torquay House Build - Pouring the Slab

05c Torquay Build - The Slab being Poured

05a Torquay House Build - The slab is being poured

Hopefully it won’t be too long before I will be posting pictures of the frame going up!